Hodge Howe 3
This 1930s semi-detached property in Windermere was originally poorly insulated, draughty, and expensive to heat. A comprehensive deep retrofit delivered a 67% reduction in annual heat demand - from 256.51 to 93.39 kWh/m2a - bringing the property to the ASHP - ready threshold and demonstrating the viability of whole-house retrofit approaches for similar 1930s housing stock.
For more detailed information on our retrofit approach, see ‘SRM Approach’ below!
Windermere | Retrofit
-67%
Space heating demand
4.4
Final airtightness ACH@50Pa
£129,987
Final Build Cost
-
Total Floor Area
62.5 m2 (as defined by PassivHaus protocol)
Heating Demand (pre-retrofit)
256.51 kWh/m2a
Heating Demand (post-retrofit)
93.39 kWh/m2
Airtightness (pre-retrofit)
20.5 ACH@50P
Airtightness (post-retrofit)
4.4 ACH@50Pa
Ventilation
Blauberg fans dMEV
Windows
Existing UPVC double glazed windows retained
-
We believe that understanding the building before undertaking works is essential to providing a well-informed and tailored approach to each retrofit. This enables us to be clear about our aims and objectives for each house.
The retrofit was modelled using five analysis methods: thermal envelope modelling in Design PH (Passivhaus-accredited software), thermal bridge modelling using Therm, costing by Quantity Surveyor Fairfield Cost Consultants, Thermographic imaging and airtightness testing by Green Footsteps and with Lascar Easy Log monitoring to track air quality — temperature, relative humidity, CO2 and dewpoint post and pre-retrofit.
This analysis pinpointed the specific areas that were vital to focus on to make sure the building performed beyond a cursory U-value upgrade. Thermographic imaging and Airtightness testing were used to identify primary heat loss pathways. Revealing that air leakage - responsible for 40% of heat loss - was the most critical issue, massive air leakages were found around the ground and first-floor perimeters, bay windows and eaves junction.
The eaves junction was identified as the most significant thermal bridge: internal surface temperature measured 10°C before retrofit - well below the 15°C minimum required to prevent condensation - and accounted for 7% of total annual heat demand on its own. The junction was retrofitted with PIR board and quilt insulation in layers, with careful airtightness detailing at each stage.
Air infiltration through the first-floor void was resolved by parging the external wall around joists and installing 40mm of Diathonite (an insulating cork render), achieving a 5 ACH/hr reduction at the intermediary air test stage. Ground floor insulation was reinstalled with 100mm PIR between joists, with all OSB joints taped, contributing a further 6 ACH/hr improvement.
-
Roof
Existing loft insulation retained (approx 300mm thick quilt insulation)
U-Value - 0.15 W/m²K
Walls
Existing cavity walls had been previously insulated with blown insulation. 60mm of Gutex Thermaroom internal wall insulation finished with lime green solo was added to the existing external walls.
U-Value of main walls - 0.313 W/m²K
Floors
Ground floor
100mm PIR insulation tightly fitted between existing timber joists, 22mm OSB T&G boarding with all joints taped, Multipipe Altis Dry underfloor heating board with 12mm pipe, Ardex NA latex screed, Karndean floor finish.
U-value - 0.25 W/m²K
Intermediary floors
40mm Diathonite applied to external walls between floor joists; 100mm quilt insulation installed between floor joists.
Windows
Existing UPVC double glazed windows were retained.
U-value - 1.6 W/m²K
-
Constructor
Robert Carmichael
Architectural and Low Energy Design / Project Management
SRM Building Design Ltd.
Interior Designer
Sarah McLean
Client
Elterbeck Ltd.
Quantity Surveyor
Fairfield Cost Consultants Ltd.
Airtightness Testing
Green Footsteps Ltd.
Heating & Ventilation
Cumbria Gas