122 Conway Drive is a flagship deep energy retrofit and extension of a 1970s bungalow, designed to meet AECB performance metrics and demonstrate the viability of a whole-house low-energy upgrade. The project achieved an 88% reduction in modelled space-heating demand and a near sixfold improvement in airtightness, all while opening up the home to brighter, more connected living spaces.
-88%
Space heating demand
1.7 ACH@50Pa
Final airtightness, from 8.5
MVHR
Zehnder q350
What a difference two years makes…
From initial vision to completed home, these images showcase how thoughtful architecture and carefully considered design can transform the way a space looks, feels and is lived in.
-
Floor Area
73.5 m² → 118 m² (following extension)
Standard / Approach
AECB performance target (certification in progress)
Heating Demand (pre)
255 kWh/m².a
Heating Demand (post)
30 kWh/m².a
Airtightness (pre)
8.5 ACH@50Pa
Airtightness (post)
1.7 ACH@50Pa
Main Technologies
Solar PV; Mitsubishi Ecodan air source heat pump; Zehnder q350 MVHR; triple glazing (21 Degrees)
Completion
September 2023
-
The client's primary goal centred on balancing a low-carbon footprint and creating a healthier living environment. This dual focus shaped a design response to upgrade this existing 1970s bungalow.
The result? An open-plan living arrangement with greater natural light and improved connectivity between spaces. This was paired with a house whose energy performance meets one of the most stringent UK standards, enabling the house to come off mains gas and integrate an MVHR system for a healthy home.
-
Roof
350 mm Quilt insulation upgrade to the existing roof,
U-Value: 0.13 W/m²K
150 mm PIR insulation to the new extension roof.
U-Value: 0.15 W/m²K
Walls
Existing walls received 120 mm expanded EPS insulation system to existing cavity wall with full fill blown insulation.
U-Value 0.22 W/m²K
Extension received 120 mm of EPS insulation
U-Value 0.11 W/m²K
Windows
Full replacement with GBS78 triple glazing from 21 Degrees.
Average u-value 0.75 W/m²K
Floors
Existing timber floors replaced by insulated concrete slab/ 120 mm PIR insulation and 65 mm screed.
U-Value: 0.15 W/m²K
-
Architectural and Low Energy Design
SRM Building Design Ltd.
Principal Contractor
Stoneyard Developments Ltd.
Structural Engineer
RG Parkins (Kendal) Ltd.
ASHP and PV’s Services
Geowarmth Ltd.
Windows
21 Degrees Ltd.
Building Testing
Green Footsteps (airtightness)
MVHR
21 Degrees Ltd.
Electrical Design
Ventiv Electrical Design Ltd.; SRM Building Design Ltd.
-
A particular highlight was the shift in the contractor's approach over the course of the project — starting from a conventional build mindset and becoming fully engaged with low-energy building methods by completion.
The main challenges on site centred on bringing a 1970s structure up to a near-AECB standard: ground conditions proved more demanding than expected. The existing structure was found to be more poorly built than anticipated, with the scope of the extension and remedial works exceeding initial expectations.
The client has reported very low energy bills exceeding modelled expectations, alongside a calm healthy internal environment. If starting again, the team would push even harder on airtightness at wall and ceiling junctions, an area identified as having room for further improvement.