Brookhouse
Lancashire | Passive House and New Build
A new-build family home in Brookhouse, Lancashire, designed and delivered to Certified Passive House Plus standard on a challenging, steeply sloping site with a high water table. The project achieved an airtightness result of 0.255 ACH@50Pa, well over twice as tight as Passivhaus certification requires, on the contractor's first-ever Passive House build.
15
kWh/m².a heating demand
0.255
Final airtightness ACH@50Pa
0%
Overheating risk (uncooled)
-
The PassivHaus standard is a world-leading energy efficiency standard, guaranteeing premium air quality and thermal comfort through airtight construction, superinsulation, and mechanical ventilation with heat recovery, whilst reducing heat demand to below 15 kWh/m2 - compared to an average UK home which uses around 100 kWh/m2 - significantly reducing the load on the grid and lowering heating bills. Solar gains and the heat from occupants and appliances are almost enough to heat this dwelling. Also gives strict control over construction quality, ensuring there is no performance gap between design and construction.
-
The PassivHaus Plus standard builds on all the core PassivHaus principles, with one added requirement — annual on-site renewable energy generation of over 60 kWh/m²a. This means the building not only demands very little energy to run, but actively generates the energy it does use.
-
Floor Area
213.8 m2 (Passive House) + basement
Heating Demand
15 kWh/m2.a • Heat load 9 W/m2
Overheating Risk
0% (without Zehnder Comfoclime cooling)
Airtightness
0.255 ACH@50Pa (intermediate 0.26)
Ventilation
Zehnder Comfoclime and Comfoair - MVHR, Space Heating and cooling using a small heat pump
Hot Water
SunAmp Thermino
Renewables
26 photovoltaic panels with battery storage
Windows & Rooflights
21 degrees GBS98 triple glazing + Fakro FTT U6 Average
U-value 0.80 W/m²K
Certifier
WARM
-
SRM were appointed in 2023 to redesign an existing planning consent to achieve Passive House standards. The approved scheme - designed by others - could not be built to Passive House standard within budget, requiring a revised design that satisfied planners' strict requirements on style and materials while meeting the far more demanding performance brief.
The site presented significant challenges: a steep gradient, a consistent water table at approximately 1.8m below ground level, and the need for substantial excavation to form a parking area and a below-ground basement storey. Approximately half of the total build cost was attributable to groundworks, drainage, tanking and landscaping - a constraint that shaped every decision about where the performance budget was invested above ground.
Passive House thermal modelling using Design PH and PHPP was integrated into the architectural design process from the outset, with factory-insulated timber frame panels from PYC Construction delivering both the structural and thermal envelope in a single coordinated system.
-
Roof
Factory-insulated PYC timber frame panels with 350mm blown cellulose fibre, supplemented by 50mm mineral wool quilt on site.
U-value - 0.117 W/m²K.
Walls
Factory-insulated PYC timber frame panels with 300mm blown cellulose fibre and 50mm mineral wool service void
U-value - 0.127 W/m²K.
Floor
200mm Unilin PIR insulation board.
U-value - 0.102 W/m²K.
Windows & Rooflights
21 degrees - GBS98 triple glazing throughout, with Fakro FTT U6 triple-glazed rooflights with integrated solar blinds.
all at 0.80 W/m2K.
-
Architectural and Passivhaus Design
SRM Building Design Ltd.
Principal Contractor
Pinington Ltd
Structural & Civil
RG Parkins & Partners
Timber Frame
PYC Construction
M&E Design
Pinington Ltd • 21 Degrees • Petit Singleton Associates
MVHR & Comfoclime
21 Degrees
Windows & Doors
21 Degrees
Rooflights
Fakro UK
Photovoltaic & Battery
Go Green Solar
Steel Fabrication
Mortimer Fabrications
Passive House Certifier
WARM
Airtightness Testing
Green Footsteps
SAP & EPC
Zero3