Barakat
Originally built by GH Pattinson Ltd, this 1950s Lakeland Arts and Crafts bungalow was draughty, difficult and costly to heat. A deep retrofit to the AECB Carbonlite Standard (a heating demand of below 50 kWh/m².a) transformed it into one of the most airtight retrofit projects in the UK — achieving an 83% reduction in annual space heating demand and airtightness results that rival new-build Passivhaus construction, all without altering its distinctive external character.
Ambleside | Deep Retrofit
-83%
Space heating demand
0.485
Final airtightness ACH@50Pa
6 kW
Air source heat pump
Certification in progress
-
Floor Area
127 m²
Heating Demand (pre-retrofit)
259 kWh/m².a
Heating Demand (post-retrofit)
43 kWh/m².a
Airtightness (pre-retrofit)
8.5 ACH@50Pa
Airtightness (post-retrofit)
0.485 ACH@50Pa
Ventilation
MVHR — Paul Novus 300, 88.3% efficiency
Heating
Mitsubishi Ecodan 6kW ASHP
Windows
21 degrees GBS98 triple glazing
Avg U-value - 0.85 W/m²K
-
Thermal modelling using DesignPH and PHPP was carried out at the outset of the architectural design process — before any works were specified. This allowed the team to determine the required improvement to fabric, airtightness, and services to meet the Carbonlite target and to make informed decisions early, such as removing the west-elevation bay windows.
Airtightness was treated as a primary design discipline. A robust strategy paired with the care and diligence taken by the contractor resulted in a final result of 0.485 ACH@50Pa — one of the lowest ever recorded on a UK retrofit, and below the threshold required for new-build Passivhaus certification of 0.649 ACH.
-
Roof
Cold roof retained to avoid re-slating. 300mm natural jute to horizontal ceilings and 150mm PIR to vaulted areas.
U-value - 0.15 W/m²K.
Walls
Internal wood fibre and lime plaster system used in preference to external insulation to preserve the building's external appearance. A build-up of 60 mm was chosen to minimise condensation risk and maximise the efficacy of the insulation.
U-value - 0.36 W/m²K.
Floors
Combination of upgraded suspended timber floors with 140 mm thermo-hemp combi-jute insulation and new insulated concrete slabs onto 150mm Unilin PIR Insulation board, where joist decay was found.
U-value - 0.16–0.23 W/m²K.
Windows
Full replacement with triple glazing, improving significantly reducing adjacent road noise and diminishing the average U-value from 2.50 to 0.85 W/m²K. Significantly reducing adjacent road noise.
U-value 0.85 W/m²K.
-
Architectural and Low Energy Design
SRM Building Design Ltd.
Principal Contractor
4Site Engineering & Construction Ltd.
Electrical
Terry Allen (Electrical) Ltd.
Plumbing & Heating
Mawson Energy · Darren Taylor Plumbing
MVHR & Windows
21 Degrees Ltd.
Airtightness Testing
Green Footsteps Ltd.